image from timinphuket - things2do |
"Its structure was widely believed to convey been riddled amongst corruption in addition to mismanagement. The lastly had to live reconfigured shortly later it opened, amongst offices having to live unopen in addition to then the infinite could live converted into toilets. The facility was designed amongst a capacity of 45 1000000 passengers when it was opened inwards September 2006, a yr belatedly at that point. It right away handles 51 1000000 passengers a yr every bit Thailand’s tourism manufacture booms."
And
"The due west track unopen for repairs 209 times inwards 2011 in addition to has been unopen 55 times since the foremost of 2012. The eastern 1 has been unopen 66 times, to a greater extent than oftentimes than non to repair existing cracks. The due east track is right away expected to rest unopen until Aug. nine patch repairs are made, amongst aircraft backing upward overhead inwards asset patterns for upward to an hr in addition to to a greater extent than every bit they hold off to land. In June, mainland People's Republic of China Pacific warned that at that spot could live delays because of the track would live unopen for months of repairs."
text from asia centinal.
Apart from the long queues I idea that Suvarnabhumi was okay.
Was I wrong?